Standard
- Grey work
- PKR 2,650
- Finishing
- PKR 3,500
- Combined
- PKR 6,150
Confirmed 11 September 2026
Review due 11 December 2026
Budget planning
See how grey work and finishing choices shape your construction budget.
Choose a package separately for grey work and finishing. Rates apply to Multan only. Materials, brands and exact inclusions are confirmed in your project quotation.
Enter the covered area and complete both specifications to see the difference.
Calculated as covered area × the selected rates, plus your chosen allowance. Finishing is added to grey work when both are selected. Figures are rounded to the nearest rupee. This is an early planning estimate; drawings, site conditions and agreed specifications determine the project quotation.
Multan only · PKR per sq ft
Confirmed 11 September 2026
Review due 11 December 2026
Confirmed 11 September 2026
Review due 11 December 2026
Confirmed 11 September 2026
Review due 11 December 2026
Combined rates use the same tier for both stages. You can choose different tiers in the calculator above. Rates are reviewed every three months and become unavailable when a review is due.
Compare the specification
Compare the quoted structure, masonry, plaster, waterproofing and concealed services. Check the agreed materials, quantities and inspection requirements.
Compare flooring, sanitary fittings, doors, joinery, electrical fittings and paint. Record the brands, allowances and installation scope in each quotation.
Confirm land, design fees, approvals, taxes, utility connections, basement work, landscaping and furnishing separately. These are not added by this calculator.
These are points to compare in your quotations. The signed project specification determines what NEXHAVEN includes.